India Introduces Revised Guidelines For Electric Vehicle Charging Infrastructure

0
339
Representational image. Credit: Canva

The Ministry of Power has issued revised guidelines titled “Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024” to promote the adoption of electric vehicles (EVs) in India. Here are the key highlights:

Applicability:

  • These guidelines apply to anyone setting up and operating EV charging stations, including private owners, commercial entities, and government agencies.
  • The guidelines cover charging stations in various locations, such as public places (petrol pumps, railway stations), private parking spaces, highways, and residential societies.

Key Objectives:

  • Increase the availability of safe, reliable, and accessible EV charging stations across the country.
  • Encourage the development of a robust charging network, prioritizing essential locations.
  • Make charging stations financially viable by facilitating land access at promotional rates, speeding up electricity connection approvals, and standardizing electricity pricing.
  • Promote charging EVs during solar hours to utilize renewable energy sources.
  • The electricity grid must be prepared to handle the increasing demand for power from electric vehicle charging stations.

Types of Charging Stations:

  • Public Charging Stations (PCS): Open to all EV users for charging their vehicles.
  • Captive Charging Stations (CCS): For exclusive use by the owner/operator, such as government departments, corporate entities, or bus depots.
  • Community Charging Stations: Installed in residential societies or other accommodations for residents and authorized visitors.
ALSO READ  From Street Symbol to Electric Icon: How the Escalade Reinvented Cadillac’s Cool Factor

Setting Up a Charging Station:

Establishing and operating an EV charging station is a de-licensed activity.
Charge Point Operators (CPOs) can apply for electricity connections from Distribution Licensees (DISCOMs) with specified timelines.
DISCOMs are required to establish a user-friendly online system for single window clearance of connection applications.

Financial Incentives:

  • Public entities can offer land at subsidized rates for setting up PCS, with a revenue-sharing model based on electricity consumption.
  • The government may offer subsidies for establishing public charging stations.

Charging Fees:

  • The total fee for EV owners will comprise electricity charges, service charges, land cost (for PCS), and GST.
  • The tariff for electricity supply to EV charging stations will be a single part and will not exceed the “Average Cost of Supply” until March 31, 2028. DISCOMs will offer lower rates during solar hours to encourage charging with renewable energy.
  • Service charges for charging will have a ceiling limit and may be reviewed annually.

Charging Station Network:

  • The guidelines aim to ensure at least one charging station for every square kilometer in urban areas by 2030.
  • On highways, charging stations will be located every 20 km for regular EVs and every 100 km for long-range and heavy-duty vehicles.
  • Partnerships with existing fuel stations are encouraged to achieve wider network coverage.
ALSO READ  VinFast to Unveil New Right-Hand Drive EV Model at GIIAS 2025, Expands Commitment to Indonesia’s Green Future

Public Charging Station Requirements:

  • Must use EV chargers that comply with Indian Standards.
  • May offer online booking and real-time information display for user convenience.
  • Should provide open communication protocols for efficient data exchange with DISCOMs.
  • Offer flexible payment options.
  • Larger stations may offer additional amenities like washrooms and waiting areas.
  • Stations catering to long-range and heavy-duty EVs must have high-power chargers (minimum 240 kW) with optional liquid-cooled cables.

Information Sharing:

A national database of all public charging stations will be maintained by the Bureau of Energy Efficiency (BEE) to help EV owners locate nearby stations.

Charging at Workplaces and Residences:

  • Building owners/residents can request separate metered connections with dedicated EV charging tariffs from DISCOMs.
  • Existing connections can be used for EV charging, with the option to increase the sanctioned load if needed.
  • Residential Welfare Associations can establish community charging stations within their premises.

Charging Stations for E-Buses:

  • E-bus depots can choose to obtain electricity through either open access or a connection from the local electricity distribution company (DISCOM).
  • E-bus depots must install high-power EV chargers with a minimum capacity of 240 kW.

Vehicle to Grid (V2G) Technology:

ALSO READ  PLN Inaugurates Four New SPKLU Centers to Strengthen EV Charging Infrastructure

The guidelines aim to ensure at least one charging station for every square kilometer in urban areas by 2030.

Implementation:

  • The Bureau of Energy Efficiency (BEE) will monitor the progress and implementation of these guidelines.
  • Each state will designate a State Nodal Agency to coordinate with DISCOMs for facilitating electricity connections for various charging stations.


These revised guidelines aim to create a supportive ecosystem for the growth of EV charging infrastructure in India, paving the way for wider adoption of electric vehicles.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.