The Department of Heavy Industry (DHI) has recently Invited proposals for availing incentives under FAME II for the deployment of 1544 No.s of EV Charging Infrastructure on Highways/Expressways.
Last date of Submission of Proposal is on 07-12-2020.
Each charging station must at least host one CCS II or CHAdeMO of minimum 50 KW EVSE AND one DC 001 of 15 KW such that one CCS II and CHAdeMO EVSE can be found in an interval of 4 consecutive charging stations.
To know more about the tender refer to the document below: